Articles

Operation Plan & Log Apr. 9 / 2021

During the previous operation (Apr 9 10:54UTC), the satellite has finally responded. (i) In CW, Opti...

READ MORE

Report on revival and operation plan...

English report will be uploaded soon. OrigamiSat-1/FO-98は約2年間の信号停止を経験したのちに、2021年1月末から衛星との通信が復活してい...

READ MORE

Operation Plan & Log Mar. 24 / 2021

OrigamiSat-1開発メンバーが卒業。

READ MORE

Operation Plan & Log Mar. 21 / 2021

CW信号再び停止中です。

READ MORE

Operation Plan & Log Mar. 17 / 2021

The signal from OrigamiSat-1/FO-98 (JS1YAX) has been stopped since March 13 (Saturday). So it has be...

READ MORE

Operation Plan & Log Mar. 14 / 2021

This is the operation schedule of this week. We will send a mode threshold voltage change command s...

READ MORE

Operation Plan & Log Mar. 4 / 2021

We have lost the satellite signal on March 2nd till today. We believe that the signal will be back a...

READ MORE

Operation Plan & Log Mar. 2 / 2021

2021年3月2日朝(JST)、復活後2度目の衛星からの応答が得られました。

READ MORE